EXAMPLE 4.7.1. ESTIMATING CEMENT TILES ON REGULAR SHAPED FLOOR

Determine the number of 0.20m x 0.20m cement tiles required for a 7.0m x 9.0m office room using class B mortar mixture.


By Unit Measure Method: This is similar to the fundamental method in CHB layout.


             

             





Mortar: Cement tiles are similar with terrazzo in installation, so volume of mortar will be computed as the sand requirement. So the from the Terrazo tiles table, the volume will become:



SIZEPIECESABSANDBRASS DIVIDER
CEMENTCEMENT
m./sqm.bagsbagscu.m.meter/sqm
0.20 x 0.2025.00 0.3380.2250.018810.80
0.225 x 0.22519.75 0.3380.2250.018810.00
0.25 x 0.2516.00 0.3380.2250.01888.90
0.30 x 0.3011.11 0.3380.2250.01888.00
0.35 x 0.358.16 0.3380.2250.01886.00
0.40 x 0.406.25 0.3380.2250.01885.80

           

                       




Factors are taken from the mortar table:





CLASSPROPORTIONCEMENTCEMENTSAND
40kg50kg
A1:218.0 14.5 1.0
B1:312.0 9.5 1.0
C1:49.0 7.0 1.0
D1:57.5 6.0 1.0









By Square Meter Method:


            

Using the table of Terrazo tiles:



SIZE
PIECES
A
B
SAND
BRASS DIVIDER


CEMENT
CEMENT


m.
/sqm.
bags
bags
cu.m.
meter/sqm






0.20 x 0.20
25.00
0.338
0.225
0.0188
10.80
0.225 x 0.225
19.75
0.338
0.225
0.0188
10.00
0.25 x 0.25
16.00
0.338
0.225
0.0188
8.90
0.30 x 0.30
11.11
0.338
0.225
0.0188
8.00
0.35 x 0.35
8.16
0.338
0.225
0.0188
6.00
0.40 x 0.40
6.25
0.338
0.225
0.0188
5.80