Sunday 21 July 2019

EXAMPLE 2.9.1. ESTIMATING A CIRCULAR COLUMN USING THE TWO METHODS

Estimate the materials needed for a class A mixture of a column 90cm in diameter and 7m high.



Using the volume method:


               

               

Using class A mixture: (1:2:4)

              

              

              

Using Linear Meter Method with class A:


  • Cement = 5.726
  • Sand     = 0.318
  • Gravel   = 0.636
              

              

              



Back to 2.0. Estimating Concrete
             2.7. Estimating Concrete Slabs by the Area Method
             2.8. Estimating Concrete Columns by Linear Meter Method
             2.9. Estimating Circular Columns

No comments:

Post a Comment