EXAMPLE 2.8.2. ESTIMATING RECTANGULAR COLUMNS BY LINEAR METER METHOD

Estimate the required cement, sand, and gravel for 16- 0.45m x 0.60m columns for the first floor of a commercial structure. Clear height of the floor is 4m. Use class A.


The total length (or height) of the columns should be computed first.

                        
                        
                       

Check coefficients for 0.45m x 0.60m under class A of 40-kg cement bag.


  • Cement = 2.43
  • Sand     = 0.135
  • Gravel   = 0.270

So,