Start with taking the volume of the footings.
The typical design mix for footings is Class A (1:2:4):
- For cement:
So, volume for gravel bedding is:
Estimate gravel needed for the footing:
Taking the total of gravel needed:
Back to 2.0 Estimating Concrete
No comments:
Post a Comment