EXAMPLE 3.2.1. ESTIMATING MORTAR MATERIALS IN EXAMPLE 3.1.1.

Determine the materials for mortar to construct a wall of  height=3m by length= 4.8m. CHB thickness used is 4". Use class A mortar.



Block Laying. There is only one procedure in estimating the mortar for block laying.


                  

                   







Cell Filler.

Volume method. Based on the previous example, the wall requires 180pcs 4" CHB.

                    

                    
               
                    

CLASSPROPORTIONCEMENTCEMENTSAND







40kg
50kg






A
1:2
18.0
14.5
1.0
B
1:3
12.0
9.5
1.0
C
1:4
9.0
7.0
1.0
D
1:5
7.5
6.0
1.0



                    

                     








Area Method.

                       



CHB NUMBERABCDSAND
(40kg)(40kg)(40kg)(40kg)
per sqmbagsbagsbagsbagscu.m.
12.50.792 0.522 0.394 0.328 0.0435
12.51.526 1.018 0.763 0.633 0.0844
12.52.260 1.500 1.125 0.938 0.1250







Hundred Block Method.

                      

                 

CHB SIZEABCDSAND
(40kg)(40kg)(40kg)(40kg)
cmbagsbagsbagsbagscu.m.
10 x 20 x 406.336 4.176 3.152 2.624 0.3480
15 x 20 x 4012.150 8.104 6.072 5.064 0.6750
20 x 20 x 4018.072 12.000 9.000 7.504 1.0000