Sunday 19 August 2018

ESTIMATING FORMWORKS

credits from RMD Kwikforms
Although not a part of the resulting structure, formworks, scaffolding and staging are necessary in order to continue with the construction. 

Formworks still have the maximum frequency before materials are worn. Usually they can be reused. However, forms are lumber limiting their use for maximum of two times.

Scaffoldings and staging, on the other hand, already utilizes steel pipes, making their use longer because the material is stronger and more durable.



Click here for pdf notes on Formworks

2 comments: